STE

Samanian Technical and Engeneering Company

All Projects

Dams and Hydropower

Power Network

Roads and Traffic

Bridges

Design of flood protection at right & left banks of River Vakhsh at Rogun Dam site(Tajikistan)

Client: Rogun HPP

Rehabilitation design of existing access roads at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Design of new temporary access roads and tunnels required for construction of Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Design of transportation bridges (three steelgirder bridges with pile foundation) for access road to Leningrad pump storage HPP (Russian Federation)

Client: Hydro project Institute, Moscow (HPI)

Preparation of method of statement for excavation and support of Uma Oya underground powerhouse and technical support during construction (Sri Lanka)

Client: Nimrokh-Shahran Sazeh & Farab Co

Studies on connection and power distribution of Rogun hydropower plant to the national network of Tajikistan (Tajikistan)

Client: Barqi Tajik

Design of Shakpak Baba Tunnel, a twin tunnel on an international highway (Kazakhstan)

Client: Dena Rahsaz Construction Co. & Maram Co.

Rehabilitation design of diversion tunnels No. 1 & 2 (CT1 & CT2) in Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Conceptual design of auxiliary diversion tunnel (CT2’) for Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

All Projects

Dams and Hydropower

Power Network

Roads and Traffic

Bridges

Design of flood protection at right & left banks of River Vakhsh at Rogun Dam site(Tajikistan)

Client: Rogun HPP

Rehabilitation design of existing access roads at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Design of new temporary access roads and tunnels required for construction of Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Design of transportation bridges (three steelgirder bridges with pile foundation) for access road to Leningrad pump storage HPP (Russian Federation)

Client: Hydro project Institute, Moscow (HPI)

Preparation of method of statement for excavation and support of Uma Oya underground powerhouse and technical support during construction (Sri Lanka)

Client: Nimrokh-Shahran Sazeh & Farab Co

Studies on connection and power distribution of Rogun hydropower plant to the national network of Tajikistan (Tajikistan)

Client: Barqi Tajik

Design of Shakpak Baba Tunnel, a twin tunnel on an international highway (Kazakhstan)

Client: Dena Rahsaz Construction Co. & Maram Co.

Rehabilitation design of diversion tunnels No. 1 & 2 (CT1 & CT2) in Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Conceptual design of auxiliary diversion tunnel (CT2’) for Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

All Projects

Dams and Hydropower

Power Network

Roads and Traffic

Bridges

Design of flood protection at right & left banks of River Vakhsh at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Rehabilitation design of existing access roads at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Design of new temporary access roads and tunnels required for construction of Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Design of transportation bridges (three steelgirder bridges with pile foundation) for access road to Leningrad pump storage HPP (Russian Federation)

Client: Hydro project Institute, Moscow (HPI)

Preparation of method of statement for excavation and support of Uma Oya underground powerhouse and technical support during construction (Sri Lanka)

Client: Nimrokh-Shahran Sazeh & Farab Co

Studies on connection and power distribution of Rogun hydropower plant to the national network of Tajikistan (Tajikistan)

Client: Barqi Tajik

Design of Shakpak Baba Tunnel, a twin tunnel on an international highway (Kazakhstan)

Client: Dena Rahsaz Construction Co. & Maram Co.

Rehabilitation design of diversion tunnels No. 1 & 2 (CT1 & CT2) in Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Conceptual design of auxiliary diversion tunnel (CT2’) for Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

All Projects

Dams and Hydropower

Power Network

Roads and Traffic

Bridges

Design of flood protection at right & left banks of River Vakhsh at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Rehabilitation design of existing access roads at Rogun Dam site (Tajikistan)

Client: Rogun HPP

Design of new temporary access roads and tunnels required for construction of Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Design of transportation bridges (three steelgirder bridges with pile foundation) for access road to Leningrad pump storage HPP (Russian Federation)

Client: Hydro project Institute, Moscow (HPI)

Preparation of method of statement for excavation and support of Uma Oya underground powerhouse and technical support during construction (Sri Lanka)

Client: Nimrokh-Shahran Sazeh & Farab Co

Studies on connection and power distribution of Rogun hydropower plant to the national network of Tajikistan (Tajikistan)

Client: Barqi Tajik

Design of Shakpak Baba Tunnel, a twin tunnel on an international highway (Kazakhstan)

Client: Dena Rahsaz Construction Co. & Maram Co.

Rehabilitation design of diversion tunnels No. 1 & 2 (CT1 & CT2) in Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

Conceptual design of auxiliary diversion tunnel (CT2’) for Rogun Dam & HPP Project (Tajikistan)

Client: Rogun HPP

All Projects

Dams, Hydropower

Power Network

Roads and Traffic

Bridges

Design of Flood Protection Works on the Right and Left Banks of the Vakhsh River at the Rogun Dam Site, Tajikistan

Client: Rogun HPP

Rehabilitation Design of Existing Access Roads at the Rogun Dam Site, Tajikistan

Client: Rogun HPP

Design of New Temporary Access Roads and Tunnels for the Construction of the Rogun Dam and HPP Project, Tajikistan

Client: Rogun HPP

Design of Transportation Bridges (Three Steel-Girder Bridges with Pile Foundations) for the Access Road to the Leningrad Pumped Storage HPP, Russian Federation
Client: Hydroproject Institute, Moscow (HPI)

Preparation of Method Statement for Excavation and Support of the Uma Oya Underground Powerhouse and Provision of Technical Support During Construction, Sri Lanka
Client: Nimrokh–Shahran Sazeh & Farab Co


Studies on the Connection and Power Distribution of the Rogun Hydropower Plant to the National Grid of Tajikistan
Client: Barqi Tojik

Design of the Shakpak Baba Tunnel, a Twin Tunnel on an International Highway, Kazakhstan
Client: Dena Rahsaz Construction Co. & Maram Co.

Rehabilitation Design of Diversion Tunnels No. 1 and 2 (CT1 & CT2) in the Rogun Dam and HPP Project, Tajikistan
Client: Rogun HPP

Conceptual Design of Auxiliary Diversion Tunnel (CT2′) for the Rogun Dam and HPP Project, Tajikistan
Client: Rogun HPP

#11, Building No. 27, Javanan Street,

City of Rogun, Tajikistan

#11, Building No. 27, Javanan Street,

City of Rogun, Tajikistan

#11, Building No. 27, Javanan Street,

City of Rogun, Tajikistan

#11, Building No. 27, Javanan Street,

City of Rogun, Tajikistan